We Offer Construction Defects Support By: |
 |
Providing technical expertise from fact finding through the settlement process
|
 |
Performing a merit determination and pre-negotiation strategy for all claims made in the Plaintiff's report |
 |
Providing the professional representation necessary to obtain a favorable outcome for the client
|
| |
|
|
Construction defect litigation from a defense perspective : |
BREAKDOWN CONTENTS OF PLAINTIFF'S REPORT AND OTHER RELEVANT DOCUMENTS |
|
|
 |
Type of defects occurring |
 |
Where they are occurring |
 |
Frequency that the defects allegedly occur |
 |
The alleged cause of the defect and responsible party |
 |
Note the subcontractor allocations, based on the report |
 |
The manifestation of the defects |
 |
The proposed repair methodology |
 |
The proposed repair cost |
 |
Assist with setting insurance reserves as needed |
| |
|
|
|
PREVIEW PLAINTIFF'S REPORT FOR POTENTIAL WEAK AREAS |
|
|
 |
Determine specific locations for testing
|
 |
Test a reasonable number of defect types and locations |
 |
Have backup locations for additional inspections if necessary |
 |
Document the conditions thoroughly |
 |
Focus on the specific allegation |
 |
Rebut the allegations with the findings |
 |
Identify repetitive defects and separate those from individual anomalies |
| |
|
|
|
DESTRUCTIVE TESTING |
|
|
 |
Determine specific locations for testing
|
 |
Test a reasonable number of defect types and locations |
 |
Have backup locations for additional inspections if necessary |
 |
Document the conditions thoroughly |
 |
Focus on the specific allegation |
 |
Rebut the allegations with the findings |
 |
Identify repetitive defects and separate those from individual anomalies |
| |
|
|
|
DEFENSE RESPONSE REPORT |
|
|
 |
Assemble findings
|
 |
Contrast to Plaintiff's report |
 |
Respond to Plaintiff's report with defect matrix |
 |
Exclude allegations which can be eliminated |
 |
Segregate design from workmanship defects |
 |
Propose reasonable and effective repairs where required |
 |
Provide cost estimate |
| |
|
|
|
CROSS-COMPLAINT STRATEGY |
|
|
 |
As the Developer's or General Contractor's representative, allocate liability internally to the various subcontractors |
 |
As the Subcontractor's representative, have a solid rationale for allocating liability among other potential defendants |
| |
|
|
|
NEGOTIATIONS, MEDIATIONS, AND SETTLEMENT CONFERENCE |
|
|
 |
Agree on any common ground and eliminate from contention any items that can be eliminated |
 |
Know your positions in advance |
 |
Know where to stand firm, where to compromise, and why |
|
|
REPEAT THE PROCESS FOR AMENDED PLAINTIFF'S REPORTS AS REQUIRED |
Construction Defects
Property Losses
Estimate Format |
| |